Home

About Us

AE Policies

AE Technologies

e-library

e-library

International Cooperation

  • 12KW Solar Water Pump Gadap Karachi

    12KW Solar Water Pump Gadap Karachi

  • 26MW Co generation Power Plant at JDW Sugar Mills, Rahim Yar Khan and Ghotiki

    26MW Co generation Power Plant at JDW Sugar Mills, Rahim Yar Khan and Ghotiki

  • FFC Energy Limited 50MW Wind Farm, Jhimpir, Sindh

    FFC Energy Limited 50MW Wind Farm, Jhimpir, Sindh

  • FWEL 50MW Foundation Wind Power Plant i & ii

    FWEL 50MW Foundation Wind Power Plant i & ii

  • Quaid e Azam Solar Park, Bahawalpur, Punjab

    Quaid e Azam Solar Park, Bahawalpur, Punjab

  • ZORLU Enerji 56.4MW Wind Farm, Jhimpir, Sindh

    ZORLU Enerji 56.4MW Wind Farm, Jhimpir, Sindh

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
×

Warning

JUser: :_load: Unable to load user with ID: 994

Standard Documents

Display:
Letter of support

Letter of support

LETTER OF SUPPORT FOR THE ESTABLISHMENT OF A BAGASSE /BIOMASS BASED POWER COGENERATION   
  • Version
    1.0
  • Hits
    3071
  • Downloads
    285
  • Rating
  • Comments
    0
Performance Guarantee - LoS

Performance Guarantee - LoS

Performance Guarantee - LoS
  • Version
    1.0
  • Hits
    5472
  • Downloads
    508
  • Rating
  • Comments
    0
Bank Guarantee - LoI

Bank Guarantee - LoI

Bank Guarantee - LoI
  • Version
    1.0
  • Hits
    7160
  • Downloads
    601
  • Rating
  • Comments
    0
AEDB Biomass-Bagasse Cogeneration IA Schedules

AEDB Biomass-Bagasse Cogeneration IA Schedules

AEDB Biomass-Bagasse Cogeneration IA Schedules
  • Version
    1.0
  • Hits
    5008
  • Downloads
    502
  • Rating
  • Comments
    0
AEDB Biomass-Bagasse Cogeneration IA (draft)

AEDB Biomass-Bagasse Cogeneration IA (draft)

AEDB Biomass-Bagasse Cogeneration IA (draft)
  • Version
    1.0
  • Hits
    4973
  • Downloads
    493
  • Rating
  • Comments
    0
AEDB Biomass-Bagasse Cogeneration EPA (draft)

AEDB Biomass-Bagasse Cogeneration EPA (draft)

AEDB Biomass-Bagasse Cogeneration EPA (draft)
  • Version
    1.0
  • Hits
    6335
  • Downloads
    681
  • Rating
  • Comments
    0
Powered by JU Download

Latest News

In light of Covid-19 outbreak AEDB disinfected its Head Office

Ongoing Wind Power Projects - Jhimpir